Obstructions

The table below lists all the obstructions to navigation on the Union and Forth and Clyde canals, from east to west. It also gives the current projected dates of restoration, and thumb-nail images of some obstructions.

The table is now colour coded. Red indicates an obstruction on which restoration work has not yet begun, blue indicates an obstruction which is currently under restoration, and green indicates a former obstruction which has now been removed.

Some obstructions now have a page of their own, with chronological pictures of the restoration work going on there. Click the links to see pages about:

Union Canal

Name of obstructionDescription Projected date of restorationPicture
Leamington Bridge Derelict lifting bridge?
Kingsknowe Road Culvert under roadCompleted
Wester Hailes Over 1 mile of canal infilledCompleted
M8 Culvert under M8 MotorwayCompleted
Greendykes Road Culvert under roadCompleted
Vellore Road Culvert with 4'6" headroomCompleted
A801 Culvert under roadCompleted
Falkirk Interchange Link between canals infilledEarly 2002

Apart from the obstructions listed above, the Union Canal has survived in remarkably good condition since its closure in 1965. The absence of locks or opening bridges has obviously meant that there was less to go wrong with it, and unlike the Forth and Clyde Canal, the water is still at its original level along the whole length of the waterway. All this means that apart from clearing the blockages, the only other major work to reopen the canal will be dredging.

Forth and Clyde Canal

There are no longer any obstructions to navigation on the Forth and Clyde Canal - it was reopened in May 2001. However, I have left the obstructions table here to let people have a glimpse of what the canal was like before its restoration.

Name of obstructionDescription Projected date of restorationPicture
Grangemouth Over 1 mile of canal infilledCompleted
Abbot's Road Culvert under road in lock 4Completed
Bainsford Bridge Culvert under roadCompleted
Merer's Bridge Road built across lock 8CompletedN/A
Camelon Road Culvert under roadCompleted
Union Road Road built across lock 16Completed
Bonnybridge Culvert with 4' headroomCompleted
Castlecary Bridge Derelict swing bridgeCompleted
A80 Culvert under roadCompleted
Wyndford Bridge Fixed bridge over Lock 20Completed
Auchinstarry Bridge Derelict swing bridgeCompleted
Twechar Bridge Derelict lifting bridgeCompletedN/A
Auchendavie Water Main Pipe crosses canal, only 4' headroomCompletedN/A
Hillhead Bridge Derelict swing bridgeCompletedN/A
Townhead Bridge Culvert under roadCompletedN/A
Cadder Low bridgeCompletedN/A
Balmuildy Road Low bridgeCompletedN/A
Cleveden Road Culvert with 4' headroomCompleted
Great Western Road 600yd infill, including locks 31 and 32Completed
Duntreath Avenue 140yd infill, including lock 36Completed
Argyll Road Low bridgeCompleted
Clydebank Footbridge Low bridgeCompleted
Kilbowie Road Culvert under roadCompletedN/A
Trafalgar Street Footbridge Low bridgeCompletedN/A
Dalmuir East Bridge Culvert under roadCompleted
Erskine Ferry Bridge Derelict swing bridgeCompleted

Note: the dates given above are provisional only. I'll try to keep them as up to date and accurate as possible, but they are by no means a guarantee of when the blockages will be removed.